Jizan Substation 452
The project involves site mobilization, preparation, earthworks, pile cap works, foundation, construction, fire, sewage, potable water systems, RTR, roads, fencing, and landscaping within a construction schedule.
Substations are designed to change voltage, regulate voltage, and switch transmission and distribution circuits within and outside the grid system.
- Mobilization of crew and equipment.
- Site preparation and earthworks.
- Pile cap works as per drawings.
- Provision of roads, fencing, and landscaping
- Provision of piping for fire, sewage, potable water systems.
- Construction of substructure, auxiliary, generator foundations, roads, pavings.
Site Mobilization and Construction
Mobilization, a crucial stage before construction, sets the foundation for project implementation, ensuring timely completion and mitigating risks like delays or cost overruns.
The secret of change is to focus all of your
energy not on fighting the old but on
building the new.
Socrates Greek philosopher
The quote essentially says to ignore the current state and only focus on creating the future state.
Leave A Comment