The project involved the fabrication and erection of various steel structures, including a straightening shop, a bundle rack, an HVAC house, an ETS steel building, and an electric operated sliding door.
full articleSite mobilization, preparation, earthworks, Site preparation works, construction of foundations, roads, pavings, piping for fire, sewage, potable water systems, RTR provision of roads, fencing, and landscaping.
full articleCorrective maintenance for the B&W SPIG cooling tower is included in the service, which includes replacement of the distribution system, fill system, drift eliminators, nozzles, and thirty cells.
full articleSidem Saudi Arabia is constructing a chemical storage shelter, lime stone storage shelter, and a central chemical preparation plant for Marafiq through procurement, fabrication, grid blasting, and finishing.
full articleThe project involves the construction of 45 portable cabins for Saudi Aramco rigs, including 26 types of offices, work shops, kitchens, bathrooms, and bedrooms, all designed for 20 years of durability..
full articleThe project involves civil fabrication, supply and installation of pre-engineering buildings, shaded warehouses, storage racks, electrical plumbing and drainage facilities, and a hot-rolled steel structure.
full articleThe document provides a comprehensive guide to periodic inspections, maintenance services, repair and maintenance of cooling tower components, vibration analysis, rotational analysis, pitch angle correction, and laser alignment.
full articleCivil works for CWS include demolition of asphalt, removal of base core, concrete grade stabbing, excavated material disposal, dewatering, shoring, backfill, and compaction, restoring area to original condition.
full articleThe cold water basin drain should be left open. Lubricate the fan shaft bearings and motor base adjusting screws. The water make up valve needs to be closed. All water make-up, overflow and drain piping needs to be drained.
full article